The daily maintenance of a four pillar car lift mainly includes the following aspects:
Check fasteners:
Before use, check whether the steel wire rope, locking rod and other fasteners are safe and secure.
Regularly check whether all screws are loose and tighten them in a timely manner.
Check the hydraulic system:
Before use, check if the hydraulic oil is sufficient (generally 9L is required).
Regularly check the hydraulic oil level and replenish it promptly if any deficiencies are found.
Check the hydraulic pipeline for wear or oil leakage, and replace it if necessary.
Check the lubrication condition:
Apply ZG-3 grease to the steel wire rope pulley once every quarter.
Apply an appropriate amount of ZG-3 grease to the steel wire rope every month.
Check the lubrication condition of the guide rail, lubricate if necessary, and check if the guide rail rubber block is damaged.
Check all connecting mechanisms and transmission systems, and lubricate them.
Check safety devices:
Before use, ensure that the self-locking plate can enter the locking square hole normally, and manual safety must be fully inserted into the locking square hole before use.
Remove surrounding obstacles before lifting, and no one should stand on either side or below.
Pay attention to whether the left and right safety teeth are completely disengaged when descending, and closely observe whether the left and right are synchronized.
Check all rotating shafts and add oil to the oil pot every week to ensure smooth rotation.
Check the wear, interference, and damage of moving parts, and ensure that the insurance is working properly.
Check other components:
Check all pipeline joints, bolts, and pins to ensure good connection status, and clean the dust on the sliding parts of the lift.
Check if the exposed cables are intact and if the equipment buttons and switches are functioning properly.
Precautions for use:
When the equipment is not used for a long time or overnight, it should be lowered to the lowest position and driven away, then the power should be cut off.
If the main and auxiliary platforms are found to be unbalanced, they should be immediately stopped from use and can only work normally after being leveled again.
Record and maintenance cycle:
Regular maintenance should be carried out, specifically daily maintenance every week, weekly maintenance every month, and monthly maintenance every year, and the maintenance date and content should be recorded.
Through the above maintenance content, the normal operation and safe use of the four pillar car lift can be ensured. It is recommended to conduct regular inspections and maintenance according to the above content to extend the service life of the equipment and ensure the safety of operation.
| 黑人玩弄人妻一区二区三区 | 白丝女仆一区二区三区 | 肉丝丨少妇丨炮机X99AV | 国产伦精品一区二区三区88AV | EEUSS影院一区二区三区 | 国产无码成人爽爽爽 | 91精品无码少妇a 6 2v久久久久 | 91亚洲国产在人线播放午夜 | 国产亚洲日韩AV在线观看 | 免费无码婬片AAAA片蜜桃 | 原味视频在线www观看免 | 黄色视频无码免费观看 | 亚洲天堂在线观看网站 | 91亚洲精品国偷拍自产在线观看 | 国产69久久久欧美黑人A片 | 可以免费观看的黄色视频 | 特黄A片久久人妻少妇 | 西西444www无码精品 | 久久久不卡国产精品一区二区 | 无码人妻精品一区二区蜜桃网站文 | 91 国产丝袜在线放竹菊网 | 搡人妻熟女一区二区三区麻豆 | 销魂美女顶级少妇在线观看 | 性感美女网站在线观看 | 一道本久久色AV | 强伦人妻一区二区三区电影 | 国产高清一级A片免费看少妃 | 污污污污污污污污在线观看视频 | 乱熟女高潮一区二区在线 | 人人澡人人添人人爽一区二区 | 人与禽一级婬片A片老牛 | 中文字幕乱码人妻二区三区 | 激情情情綜合亞洲綜合網 | 少妇Bbw搡BBBB搡BBBB高 | 17C一起草在线观看入口官网 | 囯产精品国产三级国产AⅤ浪潮 | 黄色A级片视频三级三级三级 | 一级日本A片卡一卡二无码直播 | 中文字幕日韩人妻在线视频 | 精品人妻无码一区二区三区竹菊影视 |